orissa
- construction of 11 kv line tapping from rs joist pole with 55 mm 2 xlpe insulated aac-0.01 km, 63 kva wpb pole mounted dt at administrative building, infocity-i, bhubaneswar.
- Deadline : 18 Apr 2026
- Updated : 09 Apr 2026
- Value : 5.89 Lac
maharashtra
- construction of sub divisional office building at lift irrigation project division office primises tha tirora dist gondia
- Deadline : 15 Apr 2026
- Updated : 09 Apr 2026
- Value : 46.50 Lac
haryana
- providing and laying 500 mm hdpe through trenchless technology, construction of manhole, restoration of road, providing and fixing of sfrc road gully and supply, installation, commissioning of solar photovolaic grid connected roof top plant and all other
- Deadline : 28 Apr 2026
- Updated : 09 Apr 2026
- Value : 39.91 Lac
haryana
- construction of the proposed stadium at village thol in distt. kurukshetra (pdg. solar power plant and solar lights).
- Deadline : 15 Apr 2026
- Updated : 09 Apr 2026
- Value : 6.74 Lac
jharkhand
- construction of chief minister solar based lift irrigation scheme at chotki sariya under block- sariya, district- giridih
- Deadline : 18 Apr 2026
- Updated : 09 Apr 2026
- Value : 1.07 Crore
jharkhand
- construction of chief minister solar based lift irrigation scheme at murkhari (simani) under block- jamua, district- giridih
- Deadline : 18 Apr 2026
- Updated : 09 Apr 2026
- Value : 1.23 Crore
jharkhand
- construction of chief minister solar based lift irrigation scheme at chitarpur under block- ganday, district- giridih
- Deadline : 18 Apr 2026
- Updated : 09 Apr 2026
- Value : 95.21 Lac
jharkhand
- construction of chief minister solar based lift irrigation scheme at ghutwali under block- dumri, district- giridih
- Deadline : 18 Apr 2026
- Updated : 09 Apr 2026
- Value : 1.05 Crore
west bengal
- design and engineering, procurement, supply, installation, construction, testing and commissioning including warrantee obligation, operation and maintenance for twelve 12 years of a 100 mw ac solar pv power plant and 25 mw / 100 mwh battery energy
- Deadline : 23 Apr 2026
- Updated : 09 Apr 2026
- Value : See Document
uttaranchal
- construction of solar fencing in 8500 m length to stop animal movement in agricultural and habitation area and effectively mitigate man-animal conflict in devpura beat of haridwar range in district haridwar
- Deadline : 27 Apr 2026
- Updated : 09 Apr 2026
- Value : 48.48 Lac
Subscribe / Membership
