jammu & kashmir
- construction repair of lanes, drains, iron grating, black topping nallaha and other allied works in all wards at mc basohli under capex budget (uds) 2026-27.
- Deadline : 09 Sep 2026
- Updated : 22 Aug 2026
- Value : 2.00 Crore
assam
- construction of aluminium partition and removing and refixing of aluminium partition at 4th and 5th floor of meghdoot bhawan guwahati
- Deadline : 26 Aug 2026
- Updated : 21 Aug 2026
- Value : 84 Thousand
tripura
- construction of ayurvedic hospital (bplusgplus 3)at paradise chowamani, agartala, tripura / phase-1 / sh aluminium works, glazing and grill works for doors and windows, installation of submerssible pump and allied works etc
- Deadline : 27 Aug 2026
- Updated : 21 Aug 2026
- Value : 24.04 Lac
uttar pradesh
- sf of 150 ltr capacity 02 no water cooler 4 kva steblizer construction of water cooler cage and cabling work at smy gontha doharighat
- Deadline : 10 Sep 2026
- Updated : 21 Aug 2026
- Value : 2.89 Lac
uttar pradesh
- sf of 150 ltr capacity 02 no water cooler 4 kva steblizer construction of water cooler cage and cabling work at nmy mau kopaganj
- Deadline : 10 Sep 2026
- Updated : 21 Aug 2026
- Value : 3.46 Lac
haryana
- construction of 8 height boundary wall with grit plaster and rcc jali and p/fixing of 4 nos., gate at green belt of sector-8 (recall)
- Deadline : 29 Aug 2026
- Updated : 20 Aug 2026
- Value : 81.94 Lac
madhya pradesh
- regarding construction of iron nets and parapet walls on open wells at various places in the city.
- Deadline : 05 Sep 2026
- Updated : 20 Aug 2026
- Value : 7.27 Lac
arunachal pradesh
- supply of earth rammer 14 lbs with wooden handle rammer weight 14 lbs. head made of cast iron or forged steel. base size 200 mm x 200 mm minimum. heat treated. seasoned hardwood handle. handle length 1200 mm minimum. heavy duty construction for compacting
- Deadline : 09 Sep 2026
- Updated : 20 Aug 2026
- Value : See Document
rajasthan
- interlocking construction and debris removal work at the crossing, extending from in front of krishna jyani premises to balaji iron store, hanumangarh town.
- Deadline : 24 Aug 2026
- Updated : 18 Aug 2026
- Value : 10.14 Lac
himachal pradesh
- construction of vrdl lab at pt. jlnmc and hospital ( govt. millennium polytechnic chamba) at sarol (sh providing and fixing aluminium door window and signage
- Deadline : 24 Aug 2026
- Updated : 18 Aug 2026
- Value : 10.69 Lac
Subscribe / Membership
